Process and Quality
From part drawing to packing and shipment — with weekly progress reporting.

Project Process
Based on Topmell process materials: part drawing → 2D mold GA → manufacturing → tool trial → sample inspection → mold checking → packing and shipment.
- DFM and mold-flow support when needed
- Weekly progress chart with photos and videos
- FAI report around tool trials
- Inspection before shipping
How a Mold Project Moves
Input Orders and Review
Project review, BOM, and purchasing after order confirmation.
Mold Design
Design for manufacturing, with customer confirmation loops.
Manufacturing
CNC, EDM, wire cut, milling, grinding — tracked weekly.
QC Fitting
Fitting and QC checkpoints before and during trials.
Tool Trial
T1 / T2 / T3 trials as required with FAI reporting.
Ship
Final inspection before shipping and export packing.
QC Equipment Highlights
From the February 2022 Machine and Equipment List.
| Colorimeter | CS-820NEW |
|---|---|
| CMM | Hexagon — 600×800×600 mm |
| Profile Projector | Mitutoyo PJ-3000 |
| Height Gauge | Rational 300 |
| Hardness Tester | CIL ZOOC |
Process Photos










Process Questions
Can I Follow Production Without Visiting?
Yes. We offer a production schedule and weekly reports with digital pictures and videos showing machining progress.
Do You Make Samples or Pilot Runs?
Yes. We can run samples or a pilot for the mold when needed.
Can You Provide Steel and Heat-Treatment Certificates?
Yes. We can provide steel certificates or heat-treatment certificates for every export mold.
Request A Quote for Your Next Mold or Molding Project
Share drawings and requirements. We typically reply with a quotation within two working days after receiving complete information.